Orem's construction runs along the State Street corridor and around UVU — a mix of commercial redevelopment, light industrial, and infill residential.
Saw Jockey works all three regularly, from utility holes on light-industrial build-outs to wall openings for residential remodels near campus.
Recent Work in Orem
From late May through November 2026 we completed 24 jobs in Orem, with 47 field tickets in total.
Wall saw mounted on an exposed section of the Alpine Aqueduct, September 2026.
Alpine Aqueduct reach (September 2026): wall-saw cuts through an exposed section of the aqueduct wall in an open excavation, working alongside the excavator crew. This was a certified job.
Warehouse store pharmacy remodel: interior concrete cutting for a pharmacy remodel at an Orem warehouse store.
Wall Sawing — Cut precise openings in concrete walls for doors, windows, utilities, and more
Flat Sawing — Horizontal cuts in concrete floors, driveways, parking lots, and slabs
Core Drilling — Round penetrations for plumbing, electrical, HVAC, and anchor bolts
Wire Sawing — For deep, thick, or irregular cuts where conventional saws fall short
GPR Scanning — Locate rebar, conduit, and post-tension cables before you cut
Serving Orem and Surrounding Utah County
Orem is a hub of commercial and light-industrial construction, and Saw Jockey is on the ground to support it. We are also nearby for work in Provo, Lehi, Spanish Fork, and across Utah County.